Cover and Table of ContentsVolume 1
Volume 2
References--List of Preparers--List of RecipientsVolume 3—Appendices
Volume 4—Appendices
Appendix I—
Mitigation Monitoring and Reporting PlanAppendix J—Environmental Justice Reports
Appendix K—Section 4(f) and Section 106 Reports
- Cultural Resources Technical Report
- Historic Property Survey Report (MISSING)
- Archaeological Resources Supplemental Survey Technical Report
- Historic Properties Supplemental Survey Technical Report
- Section 4 (f) Evaluation Technical Report (MISSING)
Appendix L—Geotechnical Reports
- Geotechnical and Hazardous Materials Technical Report: Volume 1
- Geotechnical and Hazardous Materials Technical Report: Volume 2
- Addendum to the Geotechnical and Hazardous Materials Technical Report (MISSING)
- Century City Area Fault Investigation Report
- Century City Area Tunneling Safety Report (Rev. 1, November 2011)
- Preliminary Geotechnical and Environmental Report